Programs Construction & Invention
Bridge of Many Hands
Build your part, connect with everyone.
- Duration
- 2.5 hours
- Group size
- 20 – 500 guests
- Setting
- Indoor, Outdoor
- Style
- Collaborative
- Destination
- Da Nang, Hanoi
Key outcomes
- Cross Team Coordination
- Shared Quality Standards
- Planning Before Building
- Clear Interface Agreements
- Collective Problem Solving
- Celebrating Shared Wins
About
Every team receives the same kit of bamboo, rope and connectors, but only one section of the plan. Sections must join perfectly with the teams on either side, so engineers, negotiators and builders all have a job.
At the end the whole bridge is assembled in one line and tested under load in front of everyone. When it holds, the cheer is shared by the whole company.
Learning outcomes
Interfaces matter. The hardest part is not the section, it is the joint with the next team, just like handovers between departments.
Every team owns its part and the whole result at the same time. The debrief asks where the joints are in your own company and who looks after them.
Sample client quote. Replace it with a real one, or leave the field empty to hide this block.
Program flow
-
Briefing and team roles
Teams receive kits and section plans, and choose engineers, builders and a liaison.
-
Design and agree
Liaisons meet neighbouring teams to agree the joints and the build standard.
-
Build your section
Teams build and test their section, trading spare parts with others.
-
Assembly and load test
All sections are connected and the bridge is tested under load.
-
Debrief
What made the joints work, and where are the joints in our own company?
What is included
Included
- Facilitators and safety lead
- Building kits for every team
- Load test equipment
- Debrief
Not included
- Venue hire
- Food and drinks
- Transport
We can arrange any of these for you on request.
Frequently asked questions
Is it safe?
Yes. The load test uses weights, not people, and a safety lead stays with the build area.
Can we keep the bridge?
It can be donated to a partner school as a garden walkway on request.
Request a quote for Bridge of Many Hands
Tell us your group size, date and goals. We will reply with a tailored proposal.
